NSW · Riverina Murray · Rural

Junee Shire Council

Every development application and planning proposal lodged with Junee Shire Council, tracked daily from the NSW Planning Portal — and what share of it actually gets built.

Junee Shire Council determines a development application in a median of 29 days27 days faster than the NSW median of 56.

Measured across 59 determined development applications, last 12 months · 616 applications on record · 6 planning proposals · 6,589 people · 2,103 dwellings

Housing approved since 1 July 2024 · updated 15 Sept 2026

56 homes have been approved here

Counted from 71 of 165 determined applications — the ones stating a number of new homes, which for many of them is zero. The other 94 leave the field blank, and blank is not a zero.

8 still to be decided · 5% · 7 homes159 determined · 92% · 49 homes5 withdrawn or stopped · 3% · 2 homes

7 homes are still waiting on a decision. This is every application lodged since 1 July 2024 and where it stands today — the homes figure beside it covers applications determined in the same period, which is a different set.

What kind of housing

Dwelling house leads what Junee Shire Council has approved

Dwelling house24
Multi-dwelling and terraces17
Dual occupancy6
Ancillary structures5
Secondary dwelling4

NSW’s housing target

Junee Shire Council has no council-level target

Outside the four target areas. Covered by the single 55,000-home regional NSW allocation, which NSW does not break down by council.

Approved is not built

Across NSW, only 50% of approved homes reach construction within two years.

An approval is not a house. Lodgd matches every application to the construction certificates that follow it, site by site, across all 128 councils — so the pipeline can be read as what is likely to exist rather than what was lodged.

Register your interest →

Measured over 247,565 homes approved in the last 24 months.

Latest activity

Updated every morning from the NSW Planning Portal

  • Lodged1/DP108943228 Aug 2026
  • Lodged35 MCDONALDS LANE WANTABADGERY 265028 Aug 2026
  • Lodged14 CHURCH STREET JUNEE 266328 Aug 2026
  • Lodged39 JOHN POTTS DRIVE JUNEE 266318 Aug 2026
  • Lodged24 PEEL STREET JUNEE 266312 Aug 2026
  • ProposalAmendment No 1 - Amend the minimum lot size applying to Lots 141, 142 and Lot 15 Loughan Road Junee — Made29 Apr 2026
  • ProposalRezone land from RU1 to R5 near Illabo Village — Made29 Apr 2026

Elsewhere in NSW

Every council, the same way

How we count. These figures count homes written on development applications and complying development certificates lodged with Junee Shire Council and published on the NSW Planning Portal. NSW’s Housing Supply Dashboard counts something different. Across NSW the two land within 6% of each other; council by council they differ by more than 20% about half the time, and in both directions — for some councils NSW’s figure is far higher, for others far lower. Ours is checked application by application against the Planning Portal itself, and matches it exactly in every council tested. Lodgd publishes what is in the applications, and says so rather than adjusting to match.