Kempsey Shire Council determines a development application in a median of 90 days34 days slower than the NSW median of 56.

Measured across 258 determined development applications, last 12 months · 2,967 applications on record · 31 planning proposals · 31,017 people · 11,352 dwellings

Housing approved since 1 July 2024 · updated 15 Sept 2026

654 homes have been approved here

Counted from 410 of 700 determined applications — the ones stating a number of new homes, which for many of them is zero. The other 290 leave the field blank, and blank is not a zero. Applicants recorded 656; 2 homes are not counted here, from 2 applications whose own figures cannot be true.

86 still to be decided · 12% · 82 homes615 determined · 83% · 299 homes36 withdrawn or stopped · 5% · 26 homes

82 homes are still waiting on a decision. This is every application lodged since 1 July 2024 and where it stands today — the homes figure beside it covers applications determined in the same period, which is a different set.

What kind of housing

Apartments and shop-top leads what Kempsey Shire Council has approved

Apartments and shop-top317
Dwelling house183
Dual occupancy75
Multi-dwelling and terraces36
Secondary dwelling20
Other (stated by NSW)12

4 smaller categories are not shown. An application can carry more than one type, so these do not sum to the total above.

NSW’s housing target

Kempsey Shire Council has no council-level target

Outside the four target areas. Covered by the single 55,000-home regional NSW allocation, which NSW does not break down by council.

Approved is not built

Across NSW, only 50% of approved homes reach construction within two years.

An approval is not a house. Lodgd matches every application to the construction certificates that follow it, site by site, across all 128 councils — so the pipeline can be read as what is likely to exist rather than what was lodged.

Register your interest →

Measured over 247,565 homes approved in the last 24 months.

Latest activity

Updated every morning from the NSW Planning Portal

  • Lodged69 SMITH STREET KEMPSEY 244014 Sept 2026
  • Lodged25 DULCONGHI STREET CRESCENT HEAD 244011 Sept 2026
  • Lodged4 WIDE STREET WEST KEMPSEY 244011 Sept 2026
  • Lodged296 DONDINGALONG ROAD DONDINGALONG 244011 Sept 2026
  • Lodged76 SMITH STREET KEMPSEY 244010 Sept 2026
  • ProposalKempsey LEP 2013 - Amendment No 24 - to allow a highway service centre as an additional permitted use on Lot 200 DP1177619, 600 Macleay Valley Way Kempsey — Not Proceeding1 May 2026
  • ProposalKempsey CBD Flood Planning — Withdrawn1 May 2026

Elsewhere in NSW

Every council, the same way

How we count. These figures count homes written on development applications and complying development certificates lodged with Kempsey Shire Council and published on the NSW Planning Portal. NSW’s Housing Supply Dashboard counts something different. Across NSW the two land within 6% of each other; council by council they differ by more than 20% about half the time, and in both directions — for some councils NSW’s figure is far higher, for others far lower. Ours is checked application by application against the Planning Portal itself, and matches it exactly in every council tested. Lodgd publishes what is in the applications, and says so rather than adjusting to match.