NSW · New England North West · Regional

Tamworth Regional Council

Every development application and planning proposal lodged with Tamworth Regional Council, tracked daily from the NSW Planning Portal — and what share of it actually gets built.

Tamworth Regional Council determines a development application in a median of 64 days8 days slower than the NSW median of 56.

Measured across 395 determined development applications, last 12 months · 5,364 applications on record · 35 planning proposals · 64,507 people · 23,617 dwellings

Housing approved since 1 July 2024 · updated 15 Sept 2026

993 homes have been approved here

Counted from 1,162 of 1,703 determined applications — the ones stating a number of new homes, which for many of them is zero. The other 541 leave the field blank, and blank is not a zero. Applicants recorded 997; 4 homes are not counted here, from 4 applications whose own figures cannot be true.

101 still to be decided · 6% · 152 homes1,559 determined · 92% · 817 homes40 withdrawn or stopped · 2% · 12 homes

152 homes are still waiting on a decision. This is every application lodged since 1 July 2024 and where it stands today — the homes figure beside it covers applications determined in the same period, which is a different set.

What kind of housing

Dwelling house leads what Tamworth Regional Council has approved

Dwelling house440
Secondary dwelling169
Apartments and shop-top134
Multi-dwelling and terraces123
Dual occupancy106
Residential (form not stated)13

3 smaller categories are not shown. An application can carry more than one type, so these do not sum to the total above.

NSW’s housing target

Tamworth Regional Council has no council-level target

Outside the four target areas. Covered by the single 55,000-home regional NSW allocation, which NSW does not break down by council.

Approved is not built

Across NSW, only 50% of approved homes reach construction within two years.

An approval is not a house. Lodgd matches every application to the construction certificates that follow it, site by site, across all 128 councils — so the pipeline can be read as what is likely to exist rather than what was lodged.

Register your interest →

Measured over 247,565 homes approved in the last 24 months.

Latest activity

Updated every morning from the NSW Planning Portal

  • Lodged305/-/131838314 Sept 2026
  • Lodged26 PINOT DRIVE NORTH TAMWORTH 23409 Sept 2026
  • Lodged6 MADEIRA DRIVE NORTH TAMWORTH 23409 Sept 2026
  • Lodged17 MUSCAT CLOSE NORTH TAMWORTH 23409 Sept 2026
  • Lodged149 PIPER STREET EAST TAMWORTH 23409 Sept 2026
  • ProposalRezone 55 Dampier Street and 21 Wallamore Road, Taminda to part B5 Business Development and IN1 General Industrial — Not Proceeding1 May 2026
  • ProposalTamworth Regional LEP 2010 Amendment No 1 - LEP Amendments at Manilla — Made29 Apr 2026

Elsewhere in NSW

Every council, the same way

How we count. These figures count homes written on development applications and complying development certificates lodged with Tamworth Regional Council and published on the NSW Planning Portal. NSW’s Housing Supply Dashboard counts something different. Across NSW the two land within 6% of each other; council by council they differ by more than 20% about half the time, and in both directions — for some councils NSW’s figure is far higher, for others far lower. Ours is checked application by application against the Planning Portal itself, and matches it exactly in every council tested. Lodgd publishes what is in the applications, and says so rather than adjusting to match.