NSW · New England North West · Rural

Tenterfield Shire Council

An approval is not a home. A complying development certificate (CDC) approves work that meets fixed, published standards — a new house, a granny flat, a pool, an extension — without a development application, and the council or a private certifier can issue it.

3 CDCs were lodged in Tenterfield Shire Council in the last 12 months.

65 CDCs and modifications on record

Latest lodged

Straight from the NSW Planning Portal

  • CDC11 Francis Street Tenterfield 2372Dwelling house, Erection of a new structureApproved11 June 2026
  • CDC2615 Torrington Road Torrington 2371Farm buildings, Erection of a new structureApproved22 Apr 2026
  • CDC57 Haddocks Road Tenterfield 2372Erection of a new structure, Swimming poolApproved5 Nov 2025
  • CDC760 Billirimba Road Tenterfield 2372Shed, Erection of a new structureApproved31 Oct 2025
  • CDCUrbenville Road Urbenville 2475Shed, Erection of a new structureApproved24 Sept 2025
  • CDC615 Sandy Flat Road Sandy Flat 2372Dwelling house, Alterations or additions to an existing building or structureApproved27 Mar 2025
  • CDC303 Dalmoak Road Ruby Creek 4380Dwelling house, Erection of a new structure, AgricultureApproved19 Mar 2025
  • CDC6973 Bruxner Way Dumaresq Valley 2372Alterations or additions to an existing building or structure, Residential AccommodationApproved10 Mar 2025
  • CDC146 East Street Tenterfield 2372Alterations or additions to an existing building or structure, Residential AccommodationApproved17 Dec 2024
  • CDC132a Sunnyside Platform Road Tenterfield 2372Swimming poolUnder Assessment17 Sept 2024

The date on each is when it was lodged.

The fast track

Across NSW, 48% of the applications determined in the last 12 months were CDCs.

A CDC is a check against fixed standards rather than a judgement. Lodgd holds each one with where it is up to, its homes, cost and storeys — beside the development applications and building certificates on the same site, across all 128 councils.

Try the free demo →

Measured over 77,996 determined: 37,109 CDCs and 40,887 development applications. Modifications are left out.

Of every hundred development applications and CDCs NSW determined in the last 12 months, this many were CDCs.

Elsewhere in NSW

CDCs in other councils

How the system works. Complying development vs a DA · What happens to a DA · All guides →

How we count. Every complying development certificate the NSW Planning Portal lists for Tenterfield Shire Council, and every modification to one, at the status NSW gives. The count for the last 12 months is of certificates lodged in that time; modifications are listed but not counted.