NSW · North Coast · Regional

Byron Shire Council

Every development application and planning proposal lodged with Byron Shire Council, tracked daily from the NSW Planning Portal — and what share of it actually gets built.

Byron Shire Council determines a development application in a median of 80 days24 days slower than the NSW median of 56.

Measured across 363 determined development applications, last 12 months · 6,835 applications on record · 86 planning proposals · 36,519 people · 12,875 dwellings

Housing approved since 1 July 2024 · updated 15 Sept 2026

720 homes have been approved here

Counted from 758 of 1,096 determined applications — the ones stating a number of new homes, which for many of them is zero. The other 338 leave the field blank, and blank is not a zero. Applicants recorded 722; 2 homes are not counted here, from 2 applications whose own figures cannot be true.

160 still to be decided · 14% · 224 homes948 determined · 82% · 581 homes45 withdrawn or stopped · 4% · 15 homesWithdrawn 43 · Not proceeding 2

224 homes are still waiting on a decision. This is every application lodged since 1 July 2024 and where it stands today — the homes figure beside it covers applications determined in the same period, which is a different set.

What kind of housing

Dwelling house leads what Byron Shire Council has approved

Dwelling house288
Apartments and shop-top120
Dual occupancy117
Secondary dwelling75
Multi-dwelling and terraces49
Ancillary structures27

5 smaller categories are not shown. An application can carry more than one type, so these do not sum to the total above.

NSW’s housing target

Byron Shire Council has no council-level target

Outside the four target areas. Covered by the single 55,000-home regional NSW allocation, which NSW does not break down by council.

Approved is not built

Across NSW, only 50% of approved homes reach construction within two years.

An approval is not a house. Lodgd matches every application to the construction certificates that follow it, site by site, across all 128 councils — so the pipeline can be read as what is likely to exist rather than what was lodged.

Register your interest →

Measured over 247,565 homes approved in the last 24 months.

Latest activity

Updated every morning from the NSW Planning Portal

  • Lodged4 FALCON WAY MULLUMBIMBY 248214 Sept 2026
  • Lodged4 BUNYA PLACE SUFFOLK PARK 248110 Sept 2026
  • Lodged67 BOUGAINVILLEA DRIVE FEDERAL 24809 Sept 2026
  • Lodged51 CLOVER HILL CIRCUIT BANGALOW 24799 Sept 2026
  • Lodged87 MYRTLE ROAD COORABELL 24799 Sept 2026
  • ProposalRezoning of Lot 32 DP 1169053 Tuckeroo Avenue, Mullumbimby — Under Assessment4 Sept 2026
  • ProposalByron LEP 2014 - Introduce an R1 General Residential zone and diverse housing provisions into the Byron LEP 2014 and rezone part of Lot 22 DP 1073165, Stuart Street, Mullumbimby, to R1 General Residential, amend the associated minimum lot size, reclassify the land and apply the diverse housing provisions — Not Proceeding1 May 2026

Elsewhere in NSW

Every council, the same way

How we count. These figures count homes written on development applications and complying development certificates lodged with Byron Shire Council and published on the NSW Planning Portal. NSW’s Housing Supply Dashboard counts something different. Across NSW the two land within 6% of each other; council by council they differ by more than 20% about half the time, and in both directions — for some councils NSW’s figure is far higher, for others far lower. Ours is checked application by application against the Planning Portal itself, and matches it exactly in every council tested. Lodgd publishes what is in the applications, and says so rather than adjusting to match.