NSW · Central West and Orana · Rural

Cabonne Council

Every development application and planning proposal lodged with Cabonne Council, tracked daily from the NSW Planning Portal — and what share of it actually gets built.

Cabonne Council determines a development application in a median of 21 days35 days faster than the NSW median of 56.

Measured across 130 determined development applications, last 12 months · 1,531 applications on record · 20 planning proposals · 13,895 people · 4,913 dwellings

Housing approved since 1 July 2024 · updated 15 Sept 2026

128 homes have been approved here

Counted from 179 of 370 determined applications — the ones stating a number of new homes, which for many of them is zero. The other 191 leave the field blank, and blank is not a zero.

16 still to be decided · 4% · 5 homes330 determined · 92% · 124 homes14 withdrawn or stopped · 4% · 7 homesWithdrawn 13 · Not proceeding 1

5 homes are still waiting on a decision. This is every application lodged since 1 July 2024 and where it stands today — the homes figure beside it covers applications determined in the same period, which is a different set.

What kind of housing

Dwelling house leads what Cabonne Council has approved

Dwelling house107
Dual occupancy10
Ancillary structures3
Apartments and shop-top3
Secondary dwelling2

3 smaller categories are not shown. An application can carry more than one type, so these do not sum to the total above.

NSW’s housing target

Cabonne Council has no council-level target

Outside the four target areas. Covered by the single 55,000-home regional NSW allocation, which NSW does not break down by council.

Approved is not built

Across NSW, only 50% of approved homes reach construction within two years.

An approval is not a house. Lodgd matches every application to the construction certificates that follow it, site by site, across all 128 councils — so the pipeline can be read as what is likely to exist rather than what was lodged.

Register your interest →

Measured over 247,565 homes approved in the last 24 months.

Latest activity

Updated every morning from the NSW Planning Portal

  • Lodged1869 PACKHAM DRIVE MANILDRA 286514 Sept 2026
  • Lodged46 THISTLE STREET MOLONG 28668 Sept 2026
  • Lodged19 manchester lane, canobolas7 Sept 2026
  • Lodged306 COWRIGA ROAD SPRING HILL 28007 Sept 2026
  • Lodged237 BRYMEDURA LANE MANILDRA 28657 Sept 2026
  • ProposalLANNING PROPOSAL – AMENDMENT TO CABONNE LOCAL ENVIRONMENTAL PLAN 2012 - CENTA-PAK ENTERPRISES – — Pre-Exhibition25 June 2026
  • ProposalProposed rezoning of 11 Strathnook Lane, Clifton Grove, from RU1 to R5 — Withdrawn1 May 2026

Elsewhere in NSW

Every council, the same way

How we count. These figures count homes written on development applications and complying development certificates lodged with Cabonne Council and published on the NSW Planning Portal. NSW’s Housing Supply Dashboard counts something different. Across NSW the two land within 6% of each other; council by council they differ by more than 20% about half the time, and in both directions — for some councils NSW’s figure is far higher, for others far lower. Ours is checked application by application against the Planning Portal itself, and matches it exactly in every council tested. Lodgd publishes what is in the applications, and says so rather than adjusting to match.