NSW · Hunter · Regional

Muswellbrook Shire Council

Every development application and planning proposal lodged with Muswellbrook Shire Council, tracked daily from the NSW Planning Portal — and what share of it actually gets built.

Muswellbrook Shire Council determines a development application in a median of 49 days7 days faster than the NSW median of 56.

Measured across 128 determined development applications, last 12 months · 1,419 applications on record · 21 planning proposals · 16,632 people · 6,001 dwellings

Housing approved since 1 July 2024 · updated 15 Sept 2026

285 homes have been approved here

Counted from 190 of 372 determined applications — the ones stating a number of new homes, which for many of them is zero. The other 182 leave the field blank, and blank is not a zero. Applicants recorded 287; 2 homes are not counted here, from 2 applications whose own figures cannot be true.

85 still to be decided · 20% · 23 homes331 determined · 77% · 169 homes13 withdrawn or stopped · 3% · 8 homesWithdrawn 8 · Not proceeding 5

23 homes are still waiting on a decision. This is every application lodged since 1 July 2024 and where it stands today — the homes figure beside it covers applications determined in the same period, which is a different set.

What kind of housing

Dwelling house leads what Muswellbrook Shire Council has approved

Dwelling house189
Seniors and specialised housing30
Dual occupancy29
Apartments and shop-top14
Secondary dwelling10
Multi-dwelling and terraces9

2 smaller categories are not shown. An application can carry more than one type, so these do not sum to the total above.

NSW’s housing target

Muswellbrook Shire Council has no council-level target

Outside the four target areas. Covered by the single 55,000-home regional NSW allocation, which NSW does not break down by council.

Approved is not built

Across NSW, only 50% of approved homes reach construction within two years.

An approval is not a house. Lodgd matches every application to the construction certificates that follow it, site by site, across all 128 councils — so the pipeline can be read as what is likely to exist rather than what was lodged.

Register your interest →

Measured over 247,565 homes approved in the last 24 months.

Latest activity

Updated every morning from the NSW Planning Portal

  • Lodged29-31 SYDNEY STREET MUSWELLBROOK 233314 Sept 2026
  • Lodged36 ALMOND STREET DENMAN 232814 Sept 2026
  • Lodged28 WOLLOMBI ROAD MUSWELLBROOK 233311 Sept 2026
  • Lodged29 WALLARAH ROAD MUSWELLBROOK 233311 Sept 2026
  • Lodged22 STOCKYARD PARADE MUSWELLBROOK 233311 Sept 2026
  • ProposalMuswellbrook Bypass Realignment — Not Proceeding1 May 2026
  • ProposalMuswellbrook Local Environmental Plan 2009 - New Shire Wide LEP — Withdrawn1 May 2026

Elsewhere in NSW

Every council, the same way

How we count. These figures count homes written on development applications and complying development certificates lodged with Muswellbrook Shire Council and published on the NSW Planning Portal. NSW’s Housing Supply Dashboard counts something different. Across NSW the two land within 6% of each other; council by council they differ by more than 20% about half the time, and in both directions — for some councils NSW’s figure is far higher, for others far lower. Ours is checked application by application against the Planning Portal itself, and matches it exactly in every council tested. Lodgd publishes what is in the applications, and says so rather than adjusting to match.