NSW · North Coast · Regional

Ballina Shire Council

Every development application and planning proposal lodged with Ballina Shire Council, tracked daily from the NSW Planning Portal — and what share of it actually gets built.

Ballina Shire Council determines a development application in a median of 48 days8 days faster than the NSW median of 56.

Measured across 346 determined development applications, last 12 months · 4,618 applications on record · 82 planning proposals · 46,728 people · 18,281 dwellings

Housing approved since 1 July 2024 · updated 15 Sept 2026

849 homes have been approved here

Counted from 789 of 1,219 determined applications — the ones stating a number of new homes, which for many of them is zero. The other 430 leave the field blank, and blank is not a zero. Applicants recorded 862; 13 homes are not counted here, from 13 applications whose own figures cannot be true.

109 still to be decided · 9% · 47 homes1,046 determined · 87% · 510 homes45 withdrawn or stopped · 4% · 16 homes

47 homes are still waiting on a decision. This is every application lodged since 1 July 2024 and where it stands today — the homes figure beside it covers applications determined in the same period, which is a different set.

What kind of housing

Dwelling house leads what Ballina Shire Council has approved

Dwelling house246
Ancillary structures146
Dual occupancy134
Apartments and shop-top122
Demolition75
Secondary dwelling67

4 smaller categories are not shown. An application can carry more than one type, so these do not sum to the total above.

NSW’s housing target

Ballina Shire Council has no council-level target

Outside the four target areas. Covered by the single 55,000-home regional NSW allocation, which NSW does not break down by council.

Approved is not built

Across NSW, only 50% of approved homes reach construction within two years.

An approval is not a house. Lodgd matches every application to the construction certificates that follow it, site by site, across all 128 councils — so the pipeline can be read as what is likely to exist rather than what was lodged.

Register your interest →

Measured over 247,565 homes approved in the last 24 months.

Latest activity

Updated every morning from the NSW Planning Portal

  • Lodged19 GIBBON STREET LENNOX HEAD 247814 Sept 2026
  • Lodged78 TEAKWOOD DRIVE ALSTONVILLE 247714 Sept 2026
  • Lodged5 STEWART STREET LENNOX HEAD 247814 Sept 2026
  • Lodged1 112 EYLES DRIVE EAST BALLINA 247814 Sept 2026
  • Lodged3 SHOALHAVEN STREET ALSTONVILLE 247714 Sept 2026
  • ProposalGeneral Amendments 2026 — On Exhibition1 Aug 2026
  • ProposalCouncil Land Deferred Matter Transition Planning Proposal — Pre-Exhibition29 June 2026

Elsewhere in NSW

Every council, the same way

How we count. These figures count homes written on development applications and complying development certificates lodged with Ballina Shire Council and published on the NSW Planning Portal. NSW’s Housing Supply Dashboard counts something different. Across NSW the two land within 6% of each other; council by council they differ by more than 20% about half the time, and in both directions — for some councils NSW’s figure is far higher, for others far lower. Ours is checked application by application against the Planning Portal itself, and matches it exactly in every council tested. Lodgd publishes what is in the applications, and says so rather than adjusting to match.