Canterbury-Bankstown City Council

Every development application and planning proposal lodged with Canterbury-Bankstown City Council, tracked daily from the NSW Planning Portal — and what share of it actually gets built.

Canterbury-Bankstown City Council determines a development application in a median of 67 days11 days slower than the NSW median of 56.

Measured across 535 determined development applications, last 12 months · 18,747 applications on record · 80 planning proposals · 380,921 people · 117,031 dwellings

Housing approved since 1 July 2024 · updated 15 Sept 2026

4,903 homes have been approved here

Counted from 3,806 of 4,806 determined applications — the ones stating a number of new homes, which for many of them is zero. The other 1,000 leave the field blank, and blank is not a zero. Applicants recorded 5,005; 102 homes are not counted here, from 72 applications whose own figures cannot be true.

408 still to be decided · 8% · 628 homes4,510 determined · 86% · 4,314 homes316 withdrawn or stopped · 6% · 362 homesWithdrawn 315 · Not proceeding 1

628 homes are still waiting on a decision. This is every application lodged since 1 July 2024 and where it stands today — the homes figure beside it covers applications determined in the same period, which is a different set.

What kind of housing

Dual occupancy leads what Canterbury-Bankstown City Council has approved

Dual occupancy1,762
Apartments and shop-top1,329
Dwelling house818
Secondary dwelling746
Multi-dwelling and terraces109
Residential (form not stated)84

6 smaller categories are not shown. An application can carry more than one type, so these do not sum to the total above.

NSW’s housing target

NSW asks Canterbury-Bankstown City Council for 14,500 homes by June 2029

That target counts homes finished; everything above counts applications. A home can be approved and never built, and NSW measures the target against ABS completions data that Lodgd does not hold. The two are not a percentage of one another.

Approved is not built

Across NSW, only 50% of approved homes reach construction within two years.

An approval is not a house. Lodgd matches every application to the construction certificates that follow it, site by site, across all 128 councils — so the pipeline can be read as what is likely to exist rather than what was lodged.

Register your interest →

Measured over 247,565 homes approved in the last 24 months.

Latest activity

Updated every morning from the NSW Planning Portal

  • Lodged50 SPROULE STREET LAKEMBA 219514 Sept 2026
  • Lodged25 LAUMA AVENUE GREENACRE 219014 Sept 2026
  • Lodged5 SALOOP ROAD MILPERRA 221414 Sept 2026
  • Lodged9 SALOOP ROAD MILPERRA 221414 Sept 2026
  • Lodged118 WANGEE ROAD GREENACRE 219014 Sept 2026
  • ProposalRezone two sites from SP2 Electricity Transmission or Distribution Network to E4 General Industrial — On Exhibition23 June 2026
  • ProposalPlanning Proposal - Draft Heritage Item 64 Homer Street, Earlwood — On Exhibition23 June 2026

Elsewhere in NSW

Every council, the same way

How we count. These figures count homes written on development applications and complying development certificates lodged with Canterbury-Bankstown City Council and published on the NSW Planning Portal. NSW’s Housing Supply Dashboard counts something different. Across NSW the two land within 6% of each other; council by council they differ by more than 20% about half the time, and in both directions — for some councils NSW’s figure is far higher, for others far lower. Ours is checked application by application against the Planning Portal itself, and matches it exactly in every council tested. Lodgd publishes what is in the applications, and says so rather than adjusting to match.