NSW · Riverina Murray · Rural

Greater Hume Shire Council

Every development application and planning proposal lodged with Greater Hume Shire Council, tracked daily from the NSW Planning Portal — and what share of it actually gets built.

Greater Hume Shire Council determines a development application in a median of 36 days20 days faster than the NSW median of 56.

Measured across 156 determined development applications, last 12 months · 1,715 applications on record · 15 planning proposals · 11,692 people · 3,936 dwellings

Housing approved since 1 July 2024 · updated 15 Sept 2026

184 homes have been approved here

Counted from 237 of 459 determined applications — the ones stating a number of new homes, which for many of them is zero. The other 222 leave the field blank, and blank is not a zero. Applicants recorded 188; 4 homes are not counted here, from 4 applications whose own figures cannot be true.

25 still to be decided · 5% · 3 homes440 determined · 91% · 182 homes21 withdrawn or stopped · 4% · 4 homes

3 homes are still waiting on a decision. This is every application lodged since 1 July 2024 and where it stands today — the homes figure beside it covers applications determined in the same period, which is a different set.

What kind of housing

Dwelling house leads what Greater Hume Shire Council has approved

Dwelling house137
Dual occupancy18
Multi-dwelling and terraces13
Ancillary structures9
Apartments and shop-top5

2 smaller categories are not shown. An application can carry more than one type, so these do not sum to the total above.

NSW’s housing target

Greater Hume Shire Council has no council-level target

Outside the four target areas. Covered by the single 55,000-home regional NSW allocation, which NSW does not break down by council.

Approved is not built

Across NSW, only 50% of approved homes reach construction within two years.

An approval is not a house. Lodgd matches every application to the construction certificates that follow it, site by site, across all 128 councils — so the pipeline can be read as what is likely to exist rather than what was lodged.

Register your interest →

Measured over 247,565 homes approved in the last 24 months.

Latest activity

Updated every morning from the NSW Planning Portal

  • Lodged3046 TUMBARUMBA ROAD CARABOST 265014 Sept 2026
  • Lodged100 COMMERCIAL STREET WALLA WALLA 265911 Sept 2026
  • Lodged13 DAY STREET HENTY 265810 Sept 2026
  • Lodged28 JACOB WENKE DRIVE WALLA WALLA 26598 Sept 2026
  • Lodged255 GLENELLEN ROAD GLENELLEN 26427 Sept 2026
  • ProposalRezoning of Part Lot 102 (DP 778051) – RU4 to R2 with Reduced Minimum Lot Size — Pre-Exhibition25 May 2026
  • ProposalReclassify land – from Community to Operational and an Administrative Amendment to the Heritage Map — Not Proceeding1 May 2026

Elsewhere in NSW

Every council, the same way

How we count. These figures count homes written on development applications and complying development certificates lodged with Greater Hume Shire Council and published on the NSW Planning Portal. NSW’s Housing Supply Dashboard counts something different. Across NSW the two land within 6% of each other; council by council they differ by more than 20% about half the time, and in both directions — for some councils NSW’s figure is far higher, for others far lower. Ours is checked application by application against the Planning Portal itself, and matches it exactly in every council tested. Lodgd publishes what is in the applications, and says so rather than adjusting to match.