NSW · Greater Sydney · Urban

Inner West Council

Every development application and planning proposal lodged with Inner West Council, tracked daily from the NSW Planning Portal — and what share of it actually gets built.

Inner West Council determines a development application in a median of 80 days24 days slower than the NSW median of 56.

Measured across 1,069 determined development applications, last 12 months · 16,422 applications on record · 64 planning proposals · 192,577 people · 74,091 dwellings

Housing approved since 1 July 2024 · updated 15 Sept 2026

2,350 homes have been approved here

Counted from 2,500 of 3,322 determined applications — the ones stating a number of new homes, which for many of them is zero. The other 822 leave the field blank, and blank is not a zero. Applicants recorded 2,373; 23 homes are not counted here, from 19 applications whose own figures cannot be true.

324 still to be decided · 9% · 1,288 homesAwaiting lodgement 3 · Under assessment 311 · Under appeal 103,012 determined · 86% · 1,806 homes174 withdrawn or stopped · 5% · 65 homes

1,288 homes are still waiting on a decision. This is every application lodged since 1 July 2024 and where it stands today — the homes figure beside it covers applications determined in the same period, which is a different set.

What kind of housing

Dwelling house leads what Inner West Council has approved

Dwelling house1,080
Apartments and shop-top923
Multi-dwelling and terraces239
Secondary dwelling43
Dual occupancy33

6 smaller categories are not shown. An application can carry more than one type, so these do not sum to the total above.

NSW’s housing target

NSW asks Inner West Council for 7,800 homes by June 2029

That target counts homes finished; everything above counts applications. A home can be approved and never built, and NSW measures the target against ABS completions data that Lodgd does not hold. The two are not a percentage of one another.

Approved is not built

Across NSW, only 50% of approved homes reach construction within two years.

An approval is not a house. Lodgd matches every application to the construction certificates that follow it, site by site, across all 128 councils — so the pipeline can be read as what is likely to exist rather than what was lodged.

Register your interest →

Measured over 247,565 homes approved in the last 24 months.

Latest activity

Updated every morning from the NSW Planning Portal

  • Lodged110 FREDERICK STREET ASHFIELD 213114 Sept 2026
  • Lodged8 HUGH STREET ASHFIELD 213112 Sept 2026
  • Lodged15 WELLS STREET ANNANDALE 203811 Sept 2026
  • Lodged46 RENWICK STREET LEICHHARDT 204011 Sept 2026
  • Lodged78 BURFITT STREET LEICHHARDT 204011 Sept 2026
  • ProposalInner West Local Environmental Plan (LEP) Amendment – Design excellence — Under Assessment8 July 2026
  • ProposalKing Street Special Entertainment Precinct — Pre-Exhibition8 July 2026

Elsewhere in NSW

Every council, the same way

How we count. These figures count homes written on development applications and complying development certificates lodged with Inner West Council and published on the NSW Planning Portal. NSW’s Housing Supply Dashboard counts something different. Across NSW the two land within 6% of each other; council by council they differ by more than 20% about half the time, and in both directions — for some councils NSW’s figure is far higher, for others far lower. Ours is checked application by application against the Planning Portal itself, and matches it exactly in every council tested. Lodgd publishes what is in the applications, and says so rather than adjusting to match.