Cootamundra-Gundagai Regional Council

Every development application and planning proposal lodged with Cootamundra-Gundagai Regional Council, tracked daily from the NSW Planning Portal — and what share of it actually gets built.

Cootamundra-Gundagai Regional Council determines a development application in a median of 65 days9 days slower than the NSW median of 56.

Measured across 96 determined development applications, last 12 months · 1,198 applications on record · 11 planning proposals · 11,442 people · 4,490 dwellings

Housing approved since 1 July 2024 · updated 15 Sept 2026

139 homes have been approved here

Counted from 104 of 244 determined applications — the ones stating a number of new homes, which for many of them is zero. The other 140 leave the field blank, and blank is not a zero.

14 still to be decided · 6% · 6 homes213 determined · 89% · 70 homes11 withdrawn or stopped · 5% · 4 homes

6 homes are still waiting on a decision. This is every application lodged since 1 July 2024 and where it stands today — the homes figure beside it covers applications determined in the same period, which is a different set.

What kind of housing

Dwelling house leads what Cootamundra-Gundagai Regional Council has approved

Dwelling house57
Multi-dwelling and terraces57
Secondary dwelling9
Dual occupancy6
Ancillary structures5
Apartments and shop-top2

3 smaller categories are not shown. An application can carry more than one type, so these do not sum to the total above.

NSW’s housing target

Cootamundra-Gundagai Regional Council has no council-level target

Outside the four target areas. Covered by the single 55,000-home regional NSW allocation, which NSW does not break down by council.

Approved is not built

Across NSW, only 50% of approved homes reach construction within two years.

An approval is not a house. Lodgd matches every application to the construction certificates that follow it, site by site, across all 128 councils — so the pipeline can be read as what is likely to exist rather than what was lodged.

Register your interest →

Measured over 247,565 homes approved in the last 24 months.

Latest activity

Updated every morning from the NSW Planning Portal

  • Lodged9 SCOTT AVENUE COOTAMUNDRA 259010 Sept 2026
  • Lodged7448 HUME HIGHWAY COOLAC 27273 Sept 2026
  • Lodged3938 SNOWY MOUNTAINS HIGHWAY MOUNT ADRAH 27291 Sept 2026
  • Lodged9 LOUISA STREET COOTAMUNDRA 25901 Sept 2026
  • Lodged3938 SNOWY MOUNTAINS HIGHWAY MOUNT ADRAH 272927 Aug 2026
  • ProposalCootamundra LEP 2013 Additional Permitted Use Hovell Street Cootamundra — Withdrawn1 May 2026
  • ProposalCootamundra LEP (2013) Amendment 5 - IN3 (Heavy Industrial) Zone and Schedule 5 Heritage Item amendments — Made29 Apr 2026

Elsewhere in NSW

Every council, the same way

How we count. These figures count homes written on development applications and complying development certificates lodged with Cootamundra-Gundagai Regional Council and published on the NSW Planning Portal. NSW’s Housing Supply Dashboard counts something different. Across NSW the two land within 6% of each other; council by council they differ by more than 20% about half the time, and in both directions — for some councils NSW’s figure is far higher, for others far lower. Ours is checked application by application against the Planning Portal itself, and matches it exactly in every council tested. Lodgd publishes what is in the applications, and says so rather than adjusting to match.